Difference between revisions of "CCCamp 2019 - Obri's Setup"

From The Alternative Power Network
Jump to navigation Jump to search
Line 10: Line 10:
 
* 1 x Step down 400V to 12V
 
* 1 x Step down 400V to 12V
  
[[File:Screencapture-10-10-0-29-3000-d-qBcRzeOZk-pv-2019-09-08-13 16 57.png|200px]]
+
[[File:Screencapture-10-10-0-29-3000-d-qBcRzeOZk-pv-2019-09-08-13 16 57.png|600px]]

Revision as of 13:48, 8 September 2019

Hardware

  • 4 x Wattstunde WS95EFX flexible 95W Panels
  • 4 x ECS LiPro1-6 Active BMS/Balancer
  • 1 x ECS greenController 75/40 MPPT Charger
  • 4 x Winston LiFeYPO4 160Ah
  • 1 x Victron Inverter/Charger
  • 1 x PCEngines APU2 running debian for grafana and other stuff
  • 4 x Fuji F-wave 92w flexible panels
  • 1 x Step down 400V to 12V

Screencapture-10-10-0-29-3000-d-qBcRzeOZk-pv-2019-09-08-13 16 57.png