Difference between revisions of "CCCamp 2019 - Obri's Setup"
Jump to navigation
Jump to search
(→Hardware) |
(→Hardware) |
||
Line 11: | Line 11: | ||
;BMS | ;BMS | ||
[[File:IMG 20190715 222115 20190716 071426 medium.jpg|200px]] | [[File:IMG 20190715 222115 20190716 071426 medium.jpg|200px]] | ||
+ | ;WS95EFX Panels on the campvevan | ||
[[File:IMG 20190721 172159 20190722 094655 medium.jpg|200px]] | [[File:IMG 20190721 172159 20190722 094655 medium.jpg|200px]] | ||
Revision as of 13:55, 8 September 2019
Hardware
- 4 x Wattstunde WS95EFX flexible 95W Panels
- 4 x ECS LiPro1-6 Active BMS/Balancer
- 1 x ECS greenController 75/40 MPPT Charger
- 4 x Winston LiFeYPO4 160Ah
- 1 x Victron Inverter/Charger
- 1 x PCEngines APU2 running debian for grafana and other stuff
- 4 x Fuji F-wave 92w flexible panels
- 1 x Step down 400V to 12V
- BMS
- WS95EFX Panels on the campvevan
Stats
I was using Modbus to generate some nice graphs, i had some errors in the current measurements until i fixed it in the evening of August 24th.