Difference between revisions of "CCCamp 2019 - Obri's Setup"

From The Alternative Power Network
Jump to navigation Jump to search
(Created page with "== Hardware == * 4 x Wattstunde WS95EFX flexible 95W Panels * 4 x ECS LiPro1-6 Active BMS/Balancer * 1 x ECS greenController 75/40 MPPT Charger * 4 x Winston 160Ah * 1 x Vi...")
 
Line 4: Line 4:
 
* 4 x ECS LiPro1-6 Active BMS/Balancer
 
* 4 x ECS LiPro1-6 Active BMS/Balancer
 
* 1 x ECS greenController 75/40 MPPT Charger
 
* 1 x ECS greenController 75/40 MPPT Charger
* 4 x Winston 160Ah
+
* 4 x Winston LiFeYPO4 160Ah
 
* 1 x Victron Inverter/Charger
 
* 1 x Victron Inverter/Charger
 
* 1 x PCEngines APU2 running debian for grafana and other stuff
 
* 1 x PCEngines APU2 running debian for grafana and other stuff
 
* 4 x Fuji F-wave 92w flexible panels  
 
* 4 x Fuji F-wave 92w flexible panels  
 
* 1 x Step down 400V to 12V
 
* 1 x Step down 400V to 12V
 +
 +
[File:Screencapture-10-10-0-29-3000-d-qBcRzeOZk-pv-2019-09-08-13 16 57.png
 +
Jump to navigationJump to search]

Revision as of 13:46, 8 September 2019

Hardware

  • 4 x Wattstunde WS95EFX flexible 95W Panels
  • 4 x ECS LiPro1-6 Active BMS/Balancer
  • 1 x ECS greenController 75/40 MPPT Charger
  • 4 x Winston LiFeYPO4 160Ah
  • 1 x Victron Inverter/Charger
  • 1 x PCEngines APU2 running debian for grafana and other stuff
  • 4 x Fuji F-wave 92w flexible panels
  • 1 x Step down 400V to 12V

[File:Screencapture-10-10-0-29-3000-d-qBcRzeOZk-pv-2019-09-08-13 16 57.png Jump to navigationJump to search]