CCCamp 2019 - Obri's Setup

From The Alternative Power Network
Revision as of 12:55, 8 September 2019 by Obri (talk | contribs) (Hardware)
Jump to navigation Jump to search

Hardware

  • 4 x Wattstunde WS95EFX flexible 95W Panels
  • 4 x ECS LiPro1-6 Active BMS/Balancer
  • 1 x ECS greenController 75/40 MPPT Charger
  • 4 x Winston LiFeYPO4 160Ah
  • 1 x Victron Inverter/Charger
  • 1 x PCEngines APU2 running debian for grafana and other stuff
  • 4 x Fuji F-wave 92w flexible panels
  • 1 x Step down 400V to 12V
BMS

IMG 20190715 222115 20190716 071426 medium.jpg IMG 20190721 172159 20190722 094655 medium.jpg

Stats

I was using Modbus to generate some nice graphs, i had some errors in the current measurements until i fixed it in the evening of August 24th. Screencapture-10-10-0-29-3000-d-qBcRzeOZk-pv-2019-09-08-13 16 57.png