Other characteristics:

Altpwr project

The bus runs on 24VDC, and i hope to have ~1300Wp of solar panels installed on the roof of that beast for MCH2022.

I plan to use one Victron Orion TR-48-24 to consume from the grid, and one Victron Orion TR-24-48 to provide to the grid. Those DC-DC converters are galvanically isolated, so there would be no risk of accidentally bridging two 230V grids from camp infra (The ground of the bus is connected to the chassis, which is in turn connected to the ground of the shore power plug) via the ground wire.

The transfer switch will be a 3 position switch that will control the soft remote control of the Orion converter, and provide an interlock to prevent both devices from being on at the same time.